Copy

We're studying near-term walking/biking improvements and want to hear from you! We have this list of potential projects and by the end of this year, we'll select which to take to further design based on costs/benefits and your input. Take our survey by December 11 to learn more about each of the below potential improvements and select your top projects!

Map of the Mt. Baker Station area with a list of the near-term improvements being considered: 1. Extend sidewalk corners at intersection of Martin Luther King Jr Way S and Rainier Ave S. 2. Widen and repair sidewalk on the east side of Rainier Ave S. 3. Widen crosswalks crossing Rainier Ave S at S Forest St, Martin Luther King Jr Way S, and S Mt Baker Blvd. 4. Change north lane of Mt. Baker Blvd to walk and bike only 5. No right on red heading north from Rainier Ave S to Martin Luther King Jr Way S. 6. Artistic enhancements to the pedestrian bridge 7. New crosswalks across Rainier Ave S and Martin Luther King Jr Way S at S Mt Baker Blvd 8. Improve pedestrian crossings at Rainier/McClellan and MLK/McClellan
Additional outreach
We participated in a workshop with Franklin High School students to get their input (see our email update for their top picks) and we’re meeting with community groups and adjacent neighbors to receive in-person feedback. Contact us to learn more.

Other Accessible Mt Baker work
We’re collaborating with partner agencies to take steps toward the town center vision including studying the feasibility of relocating the Metro Transit Center closer to the Mt Baker Light Rail station. Check out our webpage for more info.

Thank you!

Accessible Mt Baker project team
Email: AMB@seattle.gov
Phone: 206-775-8720
The Rainier/MLK intersection is in the middle of major destinations including the Mt Baker Link Light Rail Station, King County Metro Transit Center, Franklin High School, housing, and retail. As part of the Accessible Mt Baker project, we’re working on near-term improvements to improve walking and bike access in the area and to better connect the transit center to the light rail station.
If you need this information translated, please call (206) 775-8720.
Servicios de traducción e interpretación disponibles bajo petición (206) 775-8720.
Dịch và thông dịch viên sẵn sàng nếu có sự yêu cầu (206) 775-8720.
如果您需要此信息翻譯成中文請致電 (206) 775-8720.
요청하시면 번역이나 통역을 제공해드립니다 (206) 775-8720.
Haddii aad dooneyso turjubeen fadlen wac (206) 775-8720.
Matutulungan ka naming maintindihan kung hihingi kang tulong (206) 775-8720.
ስለ ፕሮጄክቱ የበለጠ ለማወቅ ወይም ትርጉም አገልግሎት ለማግኘት ጥያቄ ለማቅረብ ወደዚህ ይደውሉ (206) 775-8720.
Twitter
Facebook
Website
Accessible Mt Baker - Seattle Department of Transportation
Copyright © 2019 Seattle Department of Transportation, All rights reserved.
You are receiving this email because you've expressed interest in the Accessible Mt Baker project.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Accessible Mt Baker · 700 5th Ave Ste 3800 · Seattle Department of Transportation · Seattle, WA 98104 · USA

Email Marketing Powered by Mailchimp