Copy
View this email in your browser

e-News
 

A couple of important items:

 
Cherry Lane Tank Water Customers

This is a Public Notification for the residents of Indian Lake Borough. Do to unforeseen circumstances and weather conditions this past week, the contractors were unable to install the meter pit as planned. The filtration Plant contractors have rescheduled the installation of the meter pit into the Cherry Lane tank water system to Tuesday, March 15, 2022 starting at 8 A.M. The water will be shut down during this time frame for everyone along South Shore Trail and all connecting roads, Kickapoo Court, Pow Wow Court, Peninsula Drive from the intersection of Peninsula Drive and South Shore Trail to the top intersection of Peninsula Drive and Palmer Drive and all connecting roads with-in the said area. Other area’s of Peninsula Drive might experience lower water pressure as to directing water flow from other tanks during this time frame. We apologize for the inconvenience during this time and appreciate your patience while we are trying to improve our water quality with this project.
 
Thank You,
Dean Snyder
Water System Operator
Past e-News
Website
Not Signed Up?
Sign Up for e-News
Copyright © 2022 INDIAN LAKE BOROUGH, All rights reserved.


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.