Earlier this year at the start of Malaysia’s Movement Control Order (MCO2.0) and during monsoon season our highly trained team have embarked on a journey to offshore in peninsular water. Their task was to stabilize our client’s conductors.
The installation was purposely planned to be during monsoon season so that we can observe the viable result between before and after the installation. Before the installation, the conductor has a visible movement therefore frequent maintenance and new wedges replacement were required. This is due to lateral wave movement which causes an impact on conductors and caissons, resulting in fatigue and fracturing on the assets.
The cost-effective solution from our principal 2STABILISE AS from Norway was used for the installation; 2STABILISE Polyurethane Spacer (2PS) is a Polyurethane based method that improves HSE factors on board the steel jacket.
To our expectation, the installation was successful without a hiccup. From then on, our client should have a worry-free be it during monsoon or not, and it a maintenance-free for the next years on their stabilized assets.